100890102381 • Service: 480V 3-Phase Primary • Peak: 1,120 kW100890102382 • Service: 480V Secondary • Peak: 540 kW (4CP Sensitive)100890102383 • Service: 208/120V Commercial Lighting • Peak: 160 kW| Meter ID |
ESIID / Meter # ✎
|
Assigned Facility ✎
|
Tariff Schedule Class ✎
|
Peak Billed kW ✎
|
Annualized Spend ($) ✎
|
Pipeline Status |
|---|---|---|---|---|---|---|
mtr_01 |
100890102381 | Houston Operations Terminal | Secondary Service > 10 kVA | 1,120 kW | $218,400.00 | ✓ Synced (Daily SMT) |
mtr_02 |
100890102382 | Houston Operations Terminal | Secondary Service > 10 kVA | 540 kW | $89,640.00 | ✓ Synced (Daily SMT) |
mtr_03 |
100890102383 | Houston Operations Terminal | General Service Secondary | 160 kW | $40,200.00 | ✓ Ingested (PDF Bills) |
| Charge Description | Volume / kW | Rate ($) | Total Amount |
|---|---|---|---|
| Customer Charge | 1.00 MO | $75.000000 | $75.00 |
| Metering Charge | 1.00 MO | $38.450000 | $38.45 |
| Transmission Cost Rider (TCRF) | 1,420.00 kW | $2.482000 | $3,524.44 |
| Energy Efficiency Cost Rider (EECRF) | 344,580 kWh | $0.001480 | $1,420.80 |
| Distribution Demand Charge | 1,420.00 kW | $4.890000 | $6,943.80 |
| Transition Charges (TC2/TC3) | 344,580 kWh | $0.001920 | $661.60 |
Need to override? Changing this value recalculates the cockpit and permanently stores this mapping rule to train future extraction models.
evt_corr_90218 will record original prediction vs. user ground truth for model fine-tuning.